Wooden Clamp

After well is drilled and cleaned, casing / screen pipes need to be lowered into the well. Pipes are hold onto the lifting hoist / lifting cap and lifted over the drilled hole till the joint is made. We had the full range of lifting caps suitable for different class of pipes i.e. medium well, deep well etc.